| After more than a month of renovation, many | | | | targeted treatment to achieve a clean environment, |
| owners would move into their new home at 51 after | | | | bacteria corrosion, materials and maintenance |
| the pre-holiday friends. Able to stay really equally | | | | purposes. |
| welcomed, but it also can not believe that everything | | | | It is understood that land reclamation process is a |
| will be fine completion of its renovation, home | | | | certain order, and here for everyone to be a brief |
| improvement project acceptance, new home, land | | | | introduction. In general, the cleaning staff will clean |
| reclamation, air, etc, each link can not be ignored. | | | | the glass first, that the first bezel with a towel, and |
| With the complexity of strict inspection procedures | | | | then coated device to diluted water glass solution |
| prior to arrival, we can ensure you stay comfortable | | | | evenly coated glass from top to bottom, from top |
| after. | | | | to bottom after the child with a scraping shave, box |
| Elements of a project to see the details of the | | | | with a dry towel and wipe the water marks left on |
| quality inspection | | | | the glass on the water marks wipe clean with a |
| After getting the keys from the hands of developers | | | | chamois. Box joint cleaning, wipe. |
| need to test room, the decoration is also necessary | | | | Next, turn the bathroom, and the first round with a |
| to carry out again after the inspection, we referred | | | | wet towel to wipe from top to bottom, focusing on |
| to here as "secondary inspection." | | | | dead ends, sanitary ware and stainless steel pipe |
| Power Line: Circuit laying order to meet construction | | | | fittings, etc., then wipe with a dry towel and all-round |
| and safety standards, outlet of not less than 30 cm | | | | again, stainless steel pipe fittings stainless steel wipe |
| from the ground, three-wire grounded outlet line, line | | | | conservation liquid. |
| to line kitchen and air conditioning installation, the total | | | | Then the kitchen, or use wet towels to wipe once |
| gate installed leak-proof electrical switches, lighting | | | | again full, focused on the corner of the ground, |
| installation firm. | | | | kitchen and various stainless steel pipe fittings, with a |
| Doors and windows: switch freely, door frames, | | | | dry towel after the repeat, the conservation of |
| window frames and glass around the sealed well. | | | | stainless steel of various stainless steel pipe cleaning |
| Surface: smooth tiles, texture clear, uniform color, | | | | fluid fittings. |
| cross line horizontal, vertical, shop floor real smooth, | | | | For the bedroom and the hall, then remove with a |
| patchwork uniform straight, color and luster, no | | | | duster dust left by the wall, wipe switch boxes, air |
| scratches. | | | | vents, air conditioning vent. |
| Wall: wallpaper paste solid, tight joints, the entire | | | | The next part is the doors and door frames, is to |
| pattern, pattern match, no side seam edges neat, | | | | towel quartet built box, from top to bottom cleaning, |
| uniform coating formation, no Ao Tugan, no color, | | | | remove the glue spots stains, wipe the door frame, |
| can not afford to gray. | | | | focus frames, the door angle easily neglected, |
| Water Toys: bathroom hot and cold water switch, | | | | comprehensive cleaning, the spray the furniture wax. |
| such as taps and shower installation Pingzheng and | | | | Finally, some cleaning on the ground, focus on |
| easy to use, acceptance may repeatedly switch | | | | decoration left over paint spots, stains such as glue |
| several times to see whether water section with the | | | | point, after high temperature steam cleaner on the |
| water changes the size of the door is open. | | | | ground to heat sterilization. |
| Discharge pipe should be smooth, no back slope, no | | | | Need to remind everyone that, during the cleaning |
| plug, no leakage, floor drain grates should be just | | | | process must not be too assured Da Saba, where |
| below ground level. Acceptance should be repeated | | | | the eye would have stared at, or after the rework is |
| over the water column after the discharge to see | | | | more a waste of time and manpower. Meanwhile, the |
| whether the smooth drainage. | | | | cleaning staff's attire and equipment can be a side |
| Tile: wall and floor tiles tiling should be solid formation, | | | | note from the professional level, if at first glance is a |
| joint uniform, partial hollowing not exceed 5% of the | | | | hodge-military sense, then let them go home as early |
| total. Kitchen and toilet on the ground waterproof | | | | as possible please. |
| layer around the contact position with the wall, should | | | | 3 new homes before moving points detection, "Air" |
| be on the flips, no less than 250 mm above the | | | | Renovation is completed, move to the former do a |
| ground. Ground surface slope to drain water, not | | | | better indoor environment testing. Many people feel |
| down pan of water, not water, 24 hour water test | | | | that their choice of building materials are |
| without leakage. | | | | environmentally friendly, hanging window decoration |
| Water supply and drainage facilities: water supply and | | | | After some time, San San taste can stay up. But |
| no leakage, switching valves work well; drainage | | | | according to professionals, even if both are in line |
| unobstructed, no leakage, water phenomenon. | | | | with the national environmental standards for building |
| Paint: paint smooth, feel good, enough fuel, no nail | | | | materials, and not only clean zero pollution, let alone |
| holes, brush marks, burrs and chromatic aberration. | | | | so many building materials "gathered" together. |
| Points of 2 new home "pioneer" indispensable | | | | Moreover, building materials or furniture in the release |
| Cleaning before moving into a new home, called | | | | of some pollutants is a long process, once the |
| wasteland. The so-called home cleaning is professional | | | | ventilation, the concentration of pollutants in turn |
| cleaning staff through the use of clean equipment, | | | | increased gradually. Therefore, it is safe to find a |
| tools and agents, on the living room floor, wall, ceiling, | | | | regular indoor environmental inspection agencies to |
| balcony, kitchen, bathroom and other parts for | | | | measure, be admitted after passing the test. |
| sweeping and cleaning: on the doors and windows, | | | | After the above steps, you can stay at the official |
| glass, stove, sanitary ware, furniture, etc. for | | | | new homes come to meet friends. |